The design and construction of Lopei Bridge in Napak district
About the Project:
The Design and Construction of a multi-cell box culvert of a configuration; a 7cell multi-cell culvert, 2No. 4cell box culverts and 2cell box culvert in addition to the 4No Relief box culverts of dimensions; 1.5m by 1.5m, approach roads on both sides of the culvert crossings to Class B Gravel, and River training works upstream and downstream including gabion/ riprap protection to embankments. Lopei Bridge in Napak district, crosses over Lopei swamp along the Moroto – Kotido road linking the districts of Moroto and Kotido through Nakapelimoru Uganda National
Employer's Name:
Uganda National Roads Authority (Employer)
Terrain Services (main Contractor)