Kingfisher Shoreline Protection Works

About the Project:

The scope of work included the supply, delivery, and installation of steel sheet piles at well pads 1, 2 & 3 in the Kingfisher oil field as the primary structural component. The frontal sheet piles formed a robust retaining system, supported by a tie-back mechanism consisting of walings, tie rods, dead man anchor sheet piles, anchor plates, and connectors. In addition to sheet piling, the project featured scour protection works, which involved the placement of a primary layer of Class 1 armour stone (250kg to 350kg) interlocked with a secondary layer of Class 2 armour stone (1kg to 30kg) in front of the sheet pile system. This project reflected our commitment to delivering high-quality, sustainable engineering solutions in complex and demanding environments.

Employer's Name:

CNOOC UGANDA LIMITED

Role in Contract:

MAIN CONTRACTOR