Dynaco Engineering

Period Maintenance of Muhanga – Kisiizi – Kebisoni road (61.5Km)

About the Project:

Construction of 61.5Km gravel road complete with scarification of surface, heavy grading, road formation, full width graveling to 150mm thickness, drainage construction, culvert installation and construction.

Employer's Name:

Uganda National Roads Authority; (Employer)
Pearl Engineering Limited (main Contractor)

Role in Contract:

Sub contractor

Other Related Projects