About the Project:

The works comprise of the design and execution of civil works (Inception, Design Base Statement, Feasibility Study at Wanseko, production of a project proposal, Draft Detailed Engineering Reports) for the ferry landing site. Fencing off 500 meters, Guard house measuring 5 meters x 4m meters, Construction of a ferry concrete landing with proper retaining structures so that the minimum water depth requirement of 3.0m is achieved where the ferry docks (at least 100m length from the lake shore and 15m wide) including the safety rails, jersey barriers, bollards, fenders (on land and in the water) and entrance/exit gate all complete with reflectors and Electrical / Mechanical Installations Standard gravel access road and parking facilities

Employer's Name:

Uganda National Roads Authority

Role in Contract:

Main contractor