About the Project:
The design and build of 40m, 2X20m bridge with an additional relief box culvert. This will provide adequate hydraulic capacity. And Construction of 1km approach road on either side of the bridge and River training works upstream and downstream including gabion/ riprap protection to embankments. The images show the current Existing Ora 1 and Ora 2 bridges to be re-constructed
Employer's Name:
Uganda National Roads Authority (Employer)
China Chongqing International Construction Company CICO (main Contractor)