King Fisher Oil fields road maintenance works
About the Project:
Dynaco was contracted to carry out rehabilitation works for the Kingfisher Oil field escarpment road at the the Bridge, Box and pipe culverts and that included ;Reinstating the culvert structures ,provide protection to road embankment along ,Provide cascading concrete lined drain at bridge steep section, Cascading gabions to be used at the far end (tailwater) of the outlet channel.
Employer's Name:
CNOOC Uganda Limited