Dynaco Engineering

Lot 3: Reconstruction of Five (5) Failed Bridges on the National Road Network under Design and Build; Apaa Bridge on Amuru – Omee – Rhino Camp Road in Amuru District.

About the Project:

Key Scope Design and construction of Apaa Bridge (30m span) to carry the Amuru – Omee – Rhino Camp Road over the Apaa River in West Nile in West Nile sub-Region, Uganda, including 2 km of gravel approach roads. Design: Detailed topographical surveys, hydrological and hydraulic studies and designs, geotechnical investigations, structural analysis and design of the bridge. Construction: River diversions, excavations, earthworks and construction of bridge elements in reinforced concrete and structural steel as designed while adhering to the QHSSE requirements of the project. Key Quantities •952 cu.m Reinforced concrete for bridge works •39,719 cu.m Excavations, earthworks and pavement layers of natural gravel materials •100 m Guardrails •922 cu.m Gabion works •19 No. Road signages Contract Value: UGX 12,289,230,346 Duration: September 2023 – September 2024

Employer's Name:

Uganda National Roads Authority

Role in Contract:

Main Contractor

Other Related Projects